Product

A predictive capacity coordination layer for freight networks.

Captrixa helps freight operators act before expected capacity shortages become urgent. It combines short-horizon prediction with conditional capacity planning, continuous observation and human-approved execution — without replacing the TMS, freight exchange, ferry booking or carrier systems already in use.

Where it fits

Above your systems. Beside your planners.

Captrixa reads the signals your systems already hold and coordinates the capacity decision that sits between planning and execution. Execution stays where it is today.

Signals from the systems you already run

  • TMS
  • ERP / WMS
  • Telematics
  • Ferry booking
  • Carrier systems
  • Freight exchanges
  • Public corridor signals

Captrixa

Pre-execution capacity coordination

  1. Predict
  2. Coordinate
  3. Observe
  4. Trigger
  5. Measure

Planner approval before anything is executed

Execution stays in your existing channels

  • Contract carriers
  • Private carrier network
  • Freight exchange
  • Ferry booking
  • Dispatch / TMS
Captrixa does not replace these systems. It coordinates the decision between planning and execution.

Category

A different question from the systems around it.

Each of these categories answers an important operational question well. Captrixa is built for the one that comes before execution.

The primary question each system category answers
System categoryPrimary question
Transport management system“What must we execute?”
Visibility platform“Where is the shipment?”
Route optimiser“How should it move?”
Freight exchange“What capacity is available now?”
Procurement platform“Who should carry this confirmed load?”
Ferry reservation system“Which sailing has bookable space?”
Captrixa“What capacity decision should we prepare before the shortage becomes urgent?”

Scope

What Captrixa does not replace.

Captrixa coordinates the decision that happens before those systems execute — so each of them keeps doing what it does best.

  • Your TMS keeps planning and recording transport execution.

  • Freight exchanges keep sourcing the capacity that is available now.

  • Digital freight forwarders keep brokering and running loads.

  • Dispatch stays with your people — Captrixa is not an autonomous dispatch engine.

  • Route optimisers keep deciding how freight should move.

  • Ferry reservation systems keep managing sailings and bookable space.

Captrixa is not another TMS, freight exchange, digital freight forwarder, autonomous dispatch engine, route optimiser or ferry reservation system. It is the predictive coordination step that connects them to an earlier, better-prepared decision.

Capabilities

Four capabilities, one decision flow.

01

Corridor pressure forecasts

Captrixa estimates where demand is likely to outrun available capacity on a corridor in the next 24–48 hours, using your historical operating patterns, calendar effects and official public corridor context.

  • Probabilistic, with stated uncertainty
  • Always compared with naive seasonal baselines
  • Chronological evaluation — no look-ahead
02

Conditional capacity options

Instead of moving equipment on a forecast, planners see capacity options they could prepare: what to hold, where, on what terms and until when. Each option carries trigger and release conditions and is re-evaluated as evidence arrives.

  • Explicit trigger, release and expiry conditions
  • Respects equipment and load compatibility
  • Nothing is reserved without a person deciding
03

Human approval and audit

When an option’s conditions are met, the decision is routed to an authorised planner with the evidence behind it. Every recommendation, decision and outcome is written to an append-only audit trail.

  • Role-based decisions (ANALYST · PLANNER · ADMIN)
  • Hash-chained, tenant-scoped audit trail
  • No autonomous dispatch in pilot scope
04

Measurement that separates model from reality

Captrixa records what actually happened and compares it with what was recommended. Modelled opportunity, observed data and live outcomes are labelled separately, so value is never overstated.

  • RESEARCH · MODELED · OBSERVED · LIVE labels
  • Naive baselines kept beside every model
  • Economics only from partner-observed data

Decision logic

Prediction is only the first step.

A forecast says pressure is likely. A useful coordination system must also judge whether securing capacity early is worth the cost, whether new evidence still supports the commitment, when an option should be released, when the situation is trigger-ready — and when a planner should approve execution.

  • Forecast probabilityHow likely is the shortage?
  • Capacity availabilityWhat can still be secured, and where?
  • Option costWhat does holding capacity early cost?
  • Shortage cost & service riskWhat happens if we wait and are short?
  • Time remainingHow long until the option or window closes?

Recommendation to the planner

  • Prepare an option
  • Hold
  • Release
  • Ready to trigger

The planner decides.

PRODUCT DIRECTIONPilot decision logic. The economics are tested with design partners; they are not yet commercially validated.

Pilot workspace

What design partners work with.

The secure pilot workspace brings these modules together behind Microsoft Entra ID sign-in. Access is limited to authorised users of each partner.

  • Pilot data intake

    Validated, versioned upload of historical records with provenance checks.

  • Historical feasibility analysis

    Can your data support a forecast worth acting on? A clear go / no-go.

  • Shadow mode

    Recommendations recorded next to real planner decisions — nothing is executed.

  • Conditional capacity workflow

    Each option’s state, from prepared to triggered, approved, declined or released.

  • Public corridor context

    Official public road and port data for the corridors you operate on.

  • Decision audit trail

    Who decided what, when, and on which evidence.

Planning horizon

Why 24–48 hours.

Far enough ahead to prepare options calmly; close enough that bookings and schedules carry real signal. Captrixa focuses on this window rather than long-range capacity planning.

Test the idea on your own corridor.

Phase 1 is one route or corridor, a bounded historical study and a private feasibility report — at no cost, with no live integration, no workflow change and no autonomous action.